NGA with NF1

$3,500.00

NeuroGuide Acquisition (NGA + NF1) is a Stand alone EEG acquisition – useful for Satellite Clinics. Includes collection of EEG and real-time Surface EEG Biofeedback of Z scores of the Laplacian, Average Reference, Linked Ears, Coherence, Phase Difference, Phase Lock, Phase Shift, Relative Power, Absolute Power with Integrated Symptom Check Lists. No qEEG or editing capability. Does not require the purchase of NeuroGuide. Only one license per purchase is permitted, i.e., a 2nd license requires a 2nd purchase.

SKU: nga-with-nf1

Description

NeuroGuide Acquisition with
19 channel Z score Surface Neurofeedback

NGA + NF1 is Stand alone EEG acquisition – useful for Satellite Clinics – not necessary to purchase NeuroGuide. Includes collection of EEG, import of .NG, .EDF & Text files, re-montage, save and print, marking of traces, color and polarity control of traces. No qEEG or editing capability. Also provides 1-19 channel Z score Surface Neurofeedback (NF1). Must let us know which one of the following amplifers you will be using:

  • Advanced Brain Monitoring B-Alert X24 – We do not support models manufactured after 2013. 
  • ANT eegosport
  • BIOSIGNAL microEEG
  • BrainAmp MR (available for certain models – Contact Us)
  • BrainMaster Discovery
  • Cadwell Essentia
  • CGX/Cognionics Quick-20 & CAMP
  • Contec
  • DeMeTec Data Box 30
  • Deymed EEG 32ch
  • Fistar
  • Medicom
  • Mitsar
  • Neuroelectrics Enobio 20 & 30 ch, StarStim
  • NeuroField Q20 & Q21
  • Neuron-Spectrum 2, 3, 4, 4EP, 4P, 5, 5S
  • NeuroPulse NP-Q 10/20
  • NeXus-32
  • ScienceBeam eWave
  • Wearable Sensing DSI-24 (For Research)
  • Ybrain Mindd Scan 20
  • Zeto WR19

 

Only one license per purchase is permitted, i.e., a 2nd license requires a 2nd purchase.

 

Additional information

Amplifier Type

Advanced Brain Monitoring, ANT, Biosignal, BrainAmp, Deymed, Discovery, Fistar, Mitsar, Neuroelectrics (Enobio & Startim), NeuroField (Q20), NeuronSpectrum, Neuropulse, Nexus-32, Wearable Sensing, CGX-Cognionics, Cadwell Essentia, Contec, DeMeTec, Medicom, Zeto WR19.

Go to Top