Surface 1 to 19 Channel Z Score Cross-Frequency Neurofeedback for a 2nd NeuroGuide License

$1,000.00

Surface 1 to 19 Channel Z Score Cross-Frequency Neurofeedback for a 2nd NeuroGuide License.

SKU: NF3-2 Category:

Description

Surface 1 to 19 Channel Z Score Cross-Frequency Neurofeedback
for a 2nd NeuroGuide License

Surface 1 to 19 Channel Z Score Cross-Frequency Neurofeedback includes Linked Ears real-time Z scores. ‘Live’ or Real-time, coherence and phase amplitude  Z scores. Includes a Symptom Check List and Surface EEG Z Scores to help structure a biofeedback protocol design. LORETA Z scores measured during a QEEG analysis are also used to further aid in the development of a neurofeedback protocol. Surface 1 to 19 Channel Z Score Cross-Frequency Neurofeedback also requires the purchase of the NeuroGuide™ Collection Module. The collection module can be purchased as a stand alone module or as an add on to NeuroGuide™. Surface 1 to 19 Channel Z Score Neurofeedback & the 3-Dimensional LORETA Z Score Neurofeedback & Surface 1 to 19 Channel Z Score Cross-Frequency Neurofeedback can also be purchased as a stand alone program for instances where there are satellite clinics and multiple NeuroGuide™ programs are not needed.

Includes a multimedia player to play videos and midi sounds. The BrainMaster multimedia displays are available for BrainMaster Discovery amplifiers only  BrainMaster.com. The Deymed 3D Engine is available at Deymed Diagnostics. * Neurofeedback is used for “relaxation training”.

List of Amplifiers that can be used with the Surface Cross-Frequency Z Score NFB Add-On:

  • Advanced Brain Monitoring B-Alert X24 – We do not currently support models manufactured after 2013. 
  • ANT eegosport
  • BIOSIGNAL microEEG
  • BrainMaster Discovery
  • BrainAmp MR (available for certain models – Contact Us)
  • Cognionics Quick-20 & CAMP
  • Deymed EEG 32ch
  • Fistar
  • Mitsar
  • Neuroelectrics Enobio 20 & 30 ch, StarStim
  • NeuroField Q20
  • NeuroPulse NP-Q 10/20
  • Neuron Spectrum 2, 3, 4, 4EP, 4P
  • NeuroSync
  • NeXus-32
  • Wearable Sensing DSI-24 (For Research)
Go to Top